Wednesday, 14 November 2012
PROJECT METHODOLOGY
METHODOLOGY

Block Diagram Description

Block Diagram Description
From this block diagram, we can look the operation of flood monitoring system, in this project, we use battery as a main supply to all component to operate. Sensor 1and sensor 2 are water level sensor to give the signal to microcontroller PIC and PIC that have been program send the data to GSM. SCADA is a monitoring system to see the operation or flow of project. The valve is to control water flow to the tank.

Subscribe to:
Posts (Atom)