Wednesday, 14 November 2012

PROJECT METHODOLOGY

METHODOLOGY


Block Diagram Description


      From this block diagram, we can look the operation of flood monitoring system, in this project, we use        battery as a main supply to all component to operate. Sensor 1and sensor 2 are water level sensor to give the signal to microcontroller PIC and PIC that have been program send the data to GSM. SCADA is a monitoring system to see the operation or flow of project. The valve is to control water flow to the tank.


No comments:

Post a Comment